Brett Kosinski on Nostr: A short list of things the contractor didn't do for a simple 10x12 deck: Didn't ...
A short list of things the contractor didn't do for a simple 10x12 deck:
Didn't attach the support posts to the piles.
Didn't use ties to attach the beams to the posts.
Didn't fasten the joists to the beams. At all.
Didn't shear nail the joists to the joist hangers.
Didn't install appropriate flashing to protect the ledger and and hangers.
Welcome to the world of general contractors, where basic work ethic and minimal quality standard are optional.
Didn't attach the support posts to the piles.
Didn't use ties to attach the beams to the posts.
Didn't fasten the joists to the beams. At all.
Didn't shear nail the joists to the joist hangers.
Didn't install appropriate flashing to protect the ledger and and hangers.
Welcome to the world of general contractors, where basic work ethic and minimal quality standard are optional.