Auscandoc on Nostr: #AUC blocks Westlock #solar project | CTV News ...
#AUC blocks Westlock #solar project | CTV News https://edmonton.ctvnews.ca/alberta-utilities-commission-blocks-westlock-solar-project-1.7095135
The AUC is in the pay of the fossil fuel industry. If the same lens was applied to _any_ FFI application….
“Acestes Power ULC applied to build the 24-megawatt solar plant in 2023, which it claimed would generate enough electricity annually to power about 7,000 homes. (1/4)
The AUC is in the pay of the fossil fuel industry. If the same lens was applied to _any_ FFI application….
“Acestes Power ULC applied to build the 24-megawatt solar plant in 2023, which it claimed would generate enough electricity annually to power about 7,000 homes. (1/4)